Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2071
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLeulmi, Mohamed Anis-
dc.date.accessioned2019-11-05T09:13:25Z-
dc.date.available2019-11-05T09:13:25Z-
dc.date.issued2015-
dc.identifier.urihttp://di.univ-blida.dz:8080/jspui/handle/123456789/2071-
dc.description4.621.1.329 ; 79 p illustré ; 30 cmfr_FR
dc.description.abstractThat this memory that is more operational attempt to apprehend the automation of a drinking water pumping station in the city of Algiers. Accompanied by the world leader Schneider Electric Algeria, I could actually observe the actual functionality and required by major manufacturers of equipment. This work is structured around five chapters emphasizes the analysis of the various pumping systems used today, the operation of the pumping station, the equipment and protocols used to develop the automation solution, the steps used during programming, and finally the safety conditions within the stationfr_FR
dc.language.isofrfr_FR
dc.publisherUniv Blida1fr_FR
dc.subjectAutomatisation ; Station de pompage ; Programmationfr_FR
dc.titleRéalisation d’une solution de commande d’une station de pompage hydrauliquefr_FR
Appears in Collections:Mémoires de Master

Files in This Item:
File Description SizeFormat 
Untitled 12.pdf29,21 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.