Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/25961
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMEDJBER, MOUSSA-
dc.contributor.authorERROUKRMA, ABOUBAKR-
dc.contributor.authorBENMEDDAH, YAHIA-
dc.date.accessioned2023-10-26T10:48:52Z-
dc.date.available2023-10-26T10:48:52Z-
dc.date.issued2023-
dc.identifier.urihttps://di.univ-blida.dz/jspui/handle/123456789/25961-
dc.description4.531.1.852.p77fr_FR
dc.description.abstractThe first goal of our study is the combined cycle analysis and particularly that of the Hadjret Ennous thermal power plant with a view to evaluating these performances We have a good description of the steam cycle and its parameters in order to know its role and understand the principle of its operation. We have prepared a good detailed description of the recovery boiler and analyzed the evolution of the performance of the recovery boiler, and applied the power balance equations to all the elemeof the boiler. We have divided our work into stages:  Chapter I: Presentation of the Hadjret Ennous thermal power plant  Chapter II: Description of the combined cycle of the thermal power plant  Chapter III: Thermodynamic parameters of a steam cycle  Chapter IV: sizing of a recovery boiler  General conclusionfr_FR
dc.language.isofrfr_FR
dc.publisherblida 1fr_FR
dc.subjectHRSG, steam turbine, combined cycle.fr_FR
dc.titleÉtude de la chaudière de récupération snc-lavalinfr_FR
dc.typeOtherfr_FR
Appears in Collections:Mémoires de Master

Files in This Item:
File Description SizeFormat 
852.pdf3,5 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.