Université Blida 1

Élaboration d’un nouveau schéma de circulation PBN pour l’aérodrome de Constantine

Afficher la notice abrégée

dc.contributor.author Zerguine, Ikram
dc.contributor.author Abid, Chahira; Drareni, Fatima Zahra (promotrice); Mokhbat, Akram (promoteur)
dc.date.accessioned 2019-11-05T11:20:36Z
dc.date.available 2019-11-05T11:20:36Z
dc.date.issued 2019
dc.identifier.uri http://di.univ-blida.dz:8080/jspui/handle/123456789/2083
dc.description 96 p.;ill.+1 cd rom.-Mémoire de Master option Exploitation.-Numéro de Thèse 036/2019 fr_FR
dc.description.abstract Résumé L’objectif de notre travail est d’élaborer un schéma de circulation aérienne PBN (navigation fondée sur les performances) Pour la piste 16/34 de l’aérodrome de Constantine pour améliorer la sécurité et permettre aux aéronefs d'emprunter des routes plus directes et plus précises. Notre travail porte donc sur la conception d’une approche RNP APCH de type LNAV (avec une configuration en T) et LNAV/VNAV pour le seuil 16. Aussi l’élaboration des STAR RNAV-1 reliant les points BABOR, KAMER, DIMAO et NADJI avec le repère d’attente et également la réalisation des SID RNAV- 1 pour les deux seuils. Ainsi que la réalisation d’un raccordement ILS-PBN pour le seuil 34. Enfin l’élaboration des MVL. Grace à l’étude détaillée sur la situation du site en question, notre travail s’efforcera d’atteindre l’objectif souhaité. Abstract The purpose of our work is to elaborate an air trafic PBN scheme for the 16 /34 runway of Constantine ‘s aerodrome in orderto improve safety and allow aircrafts to use more direct and accurate routes. So, Our work is about the conception of an RNPAPCH approach procedure ‘’LNAV type’’ with a configuration on T and LNAV /VNAV procedure for the thresold 16. Also the elaboration of RNAV-1 STARs connecting the significant points BABOR, KAMER, DIMAO, and NADJI with the patterns fix and the realisation of RNAV-1 SID for both runways. As well as the connection between the existing ILS prcedure and the new PBN procedure for the thresold 34. In adition the realisation of the cerclings. Due to the detailed study of the situation of the site in question, our work will endeavor to achieve the desired objective. fr_FR
dc.language.iso fr fr_FR
dc.publisher Université Blida 01 fr_FR
dc.subject PBN fr_FR
dc.subject RNP fr_FR
dc.subject APCH fr_FR
dc.subject LNAV fr_FR
dc.subject LNAV/VNAV fr_FR
dc.subject STAR RNAV-1 fr_FR
dc.subject SID RNAV-1 fr_FR
dc.subject ILS-PBN fr_FR
dc.subject MVL fr_FR
dc.subject Cerclings fr_FR
dc.title Élaboration d’un nouveau schéma de circulation PBN pour l’aérodrome de Constantine fr_FR
dc.type Thesis fr_FR


Fichier(s) constituant ce document

Ce document figure dans la(les) collection(s) suivante(s)

Afficher la notice abrégée

Chercher dans le dépôt


Recherche avancée

Parcourir

Mon compte