Résumé:
The current final project composes of three principal parts:
Part 1: study a steel building multi-use with (G+3), located at Blida’s province, high seismicity
zone,) the analysis provided by ROBOT STRUCUTRAL ANALYSIS 2019 software.
Part 2: study a steel hangar with infrastructure made from reinforced concrete used for a
suspended swimming pool, its analysis also provided by ROBOT.
Part 3: study a suspended swimming pool, with an area of 325m² it is an obligation to verify the
behavior of the interaction fluid and pool in a seismic state to verify and calculate all sections
needed in security state, its analysis provided by SAP2000 V 2016 software